Port Machinery Monitoring is a demonstration used to demonstrate equipment training worldwide.
In this issue, with the construction and development of specialized container terminals in ports,
large container ships with horizontal installation on all sides, advanced gantry quays, portal bridges,
and ship-unloading tug ship unloaders have become the most important parts of port terminals. conventional equipment.
The equipment has high use efficiency and higher work efficiency, and provides a higher level of equipment,
production capacity and operation capacity for improving the level of operation technology.
The application of high-performance test port training technology can effectively meet employee training needs, training cycles, and improve training.
The composition and characteristics of the port crane simulator:
The port crane simulator adopts computer virtual technology to simulate the loading and unloading process
of the driver operating the crane in a three-dimensional scene, actively and in real time.
The visual system displays the 3D port scene, highly restores the real scene of the port work, the control handles
and buttons of the 1:1 simulation of the operation and the real cockpit, the layout of the entire simulator is consistent
with the real cockpit, the scene is highly simulated, and the students complete the relevant training according to the training requirements.
After the project is completed, the system summarizes all kinds of improper operation and wrong points deduction items,
so that students can reflect on and improve the operation method to achieve the purpose of teaching and training.
The port crane simulation simulator mainly includes the cockpit, the teacher’s terminal and so on.
The cockpit includes the driver’s seat, handle, button console, degree of freedom platform, visual display system,
computer system, etc.; the teacher’s side includes the computing system, display system and control system.
Post time: Nov-02-2022